翻訳と辞書
Words near each other
・ Ksawery Zakrzewski
・ Ksawery, Kuyavian-Pomeranian Voivodeship
・ Ksawerynów, Masovian Voivodeship
・ Ksawerynówek
・ Ksawerów
・ Ksawerów Nowy
・ Ksawerów Stary
・ Ksawerów, Kalisz County
・ Ksawerów, Konin County
・ Ksawerów, Lower Silesian Voivodeship
・ Ksawerów, Lublin Voivodeship
・ Ksawerów, Pabianice County
・ Ksawerów, Pajęczno County
・ Krško
・ Krško Castle
Krško Nuclear Power Plant
・ Kršlje
・ Kršna Glava
・ Krūminiai
・ Krūmiņsala
・ Krūmiņš
・ Kržava
・ Kržava, Montenegro
・ Kržeti
・ Kržince
・ Kržišče pri Čatežu
・ Kržišče, Cerknica
・ Kržišče, Krško
・ KS
・ KS 150


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Krško Nuclear Power Plant : ウィキペディア英語版
Krško Nuclear Power Plant

The Krško Nuclear Power Plant ((スロベニア語:Jedrska elektrarna Krško), , or , , (クロアチア語:Nuklearna elektrana Krško)) is located in Vrbina in the Municipality of Krško, Slovenia. The plant was connected to the power grid on October 2, 1981 and went into commercial operation on January 15, 1983. It was built as a joint venture by Slovenia and Croatia which were at the time both part of Yugoslavia.
The plant is a 2-loop Westinghouse pressurized water reactor, with a rated thermal capacity of 1,994 thermal megawatts (MWt) and 696 megawatts-electric (MWe). It runs on enriched uranium (up to 5 weight-percent 235U), fuel mass 48.7 t, with 121 fuel elements, demineralized water as the moderator, and 36 bundles of 20 control rods each made of silver, indium and cadmium alloys to regulate power. Its sister power plant is Angra I in Brazil.〔http://entrac.iaea.org/I-and-C/TM_PRAGUE_2007_05/CD/Papers/Furieri_paper.pdf〕
The operating company Nuklearna elektrarna Krško (NEK) is co-owned by the Slovenian state-owned company Gen-Energija and the Croatian state-owned company Hrvatska elektroprivreda (HEP). The power plant provides more than one-quarter of Slovenia's and 15〔http://www.eubusiness.com/news-eu/japan-disaster.9bc〕 percent of Croatia's power.
==History==

The reason why the plant is co-owned by two countries was that these then-constituent republics of Yugoslavia planned to build two plants, one in each republic, according to the original 1970 agreement and its revised version from 1982. However, that plan was abandoned in 1987 by Slovenia due to a referendum held in 1986. From that point on, there arose an issue with nuclear waste storage, because the only existing waste storage site was in Slovenia.
In 1997, ELES and NEK decided to increase the operational and decommissioning costs billed to both ELES and HEP, but the latter refused to pay. In 1998, the Government of Slovenia nationalized NEK, stopped supplying power from Krško to HEP, and sued HEP for the unpaid bills. In 1999, HEP counter-sued for damages because of lack of supply. In January 2001, the leaders of the two countries agreed on equal ownership of the Krško plant, joint responsibility for the nuclear waste, and the compensation of mutual claims.〔 The joint management of the plant was to begin on January 1, 2002. The plant was expected to start supplying Croatia with electricity by July 1, 2002 at the latest, but the connection was only established in 2003 because of protests from the local population. Since then, HEP has additionally sued the Slovenian side for damages during the latest one-year period when Krško wasn't supplying power to it.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Krško Nuclear Power Plant」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.